Typical Construction Sequence for Mechanical / Electrical / Plumbing Works in High Rise Building
Grouping of MEP Fixes like PVC Electrical conduits in Slabs :
1. MEP 1st Fix - All Concealed Items/Pipe Sleeves in Verticals/Horizontals (Column/Slab)
2. MEP 2nd Fix - Stage 1: High Level MEP Works at False Ceiling
i) Fixing supports, installation of Firefighting, Chilled Water piping, drainage pipes, water supply(hot & cold), rain water, cable ladders, G.I Conduiting, AC ducting
ii) Pressure tests and insulations
iii) Installation of FCUs, water heaters
(Note: False Ceiling people will fix runners after the Stage 1 of MEP 2nd Fix)
3. MEP 2nd Fix - Stage 2: Clearance for False Ceiling People
i) Sprinkler droppers, AC duct droppers, flexible cable for light fixtures, fire stopping and identification works etc.
(Note: False Ceiling people will close ceiling tiles and MEP people will connect their diffusers in position on the ceiling tiles - too much coordination is required at this stage)
MEP 2nd Fix: Other Areas
Installation of all equipments like AHUs(Floor mounted), all pumps, heat exchangers(if any), bus bars, generators, water tanks etc.,
4. MEP Final Fix
Installation of Air terminals, sprinkler heads, wiring accessories, low current devices, CCTV, Public Address System (PAS), Isolators, fire fighting equipments(Hydrants), Sanitaryware, DBs, SMDBs & Dressing, SMA TVs, Structured Cabling, All Switch Points
External and other MEP works
i) Connections to Main lines of Govt. Authority, water supply, drainage, ETISALAT
ii) LV Room installations (MDBs, SMDBs, DBs)
iii) Installation of external piping, Manhole construction
iv) Installation of lightning protection, Backup System, Intercom System etc.,
1. MEP 1st Fix - All Concealed Items/Pipe Sleeves in Verticals/Horizontals (Column/Slab)
2. MEP 2nd Fix - Stage 1: High Level MEP Works at False Ceiling
i) Fixing supports, installation of Firefighting, Chilled Water piping, drainage pipes, water supply(hot & cold), rain water, cable ladders, G.I Conduiting, AC ducting
ii) Pressure tests and insulations
iii) Installation of FCUs, water heaters
(Note: False Ceiling people will fix runners after the Stage 1 of MEP 2nd Fix)
3. MEP 2nd Fix - Stage 2: Clearance for False Ceiling People
i) Sprinkler droppers, AC duct droppers, flexible cable for light fixtures, fire stopping and identification works etc.
(Note: False Ceiling people will close ceiling tiles and MEP people will connect their diffusers in position on the ceiling tiles - too much coordination is required at this stage)
MEP 2nd Fix: Other Areas
Installation of all equipments like AHUs(Floor mounted), all pumps, heat exchangers(if any), bus bars, generators, water tanks etc.,
4. MEP Final Fix
Installation of Air terminals, sprinkler heads, wiring accessories, low current devices, CCTV, Public Address System (PAS), Isolators, fire fighting equipments(Hydrants), Sanitaryware, DBs, SMDBs & Dressing, SMA TVs, Structured Cabling, All Switch Points
External and other MEP works
i) Connections to Main lines of Govt. Authority, water supply, drainage, ETISALAT
ii) LV Room installations (MDBs, SMDBs, DBs)
iii) Installation of external piping, Manhole construction
iv) Installation of lightning protection, Backup System, Intercom System etc.,
Comments
Nice Works. it is really useful
Thanks for sharing a very helpful information. Please keep up sharing...
Ceiling Tile
You can check out The very best scheduling practices in Construction on our blog!
michael kors handbags sale
supreme clothing
supreme hoodie
nike air vapormax
supreme hoodie
curry 5 shoes
louboutin shoes
supreme clothing
balenciaga
Warehouse Construction Updates 2023
Warehouse Shed Builders Updates 2023
Warehouse Steel Building Construction 2023
Warehouse Contractors Updates 2023
Industrial Warehouse Manufacturers 2023
Warehouse Construction Companies 2023
Warehouse Construction Services 2023
granite dealers in chennai
Tarpaulin
Home renovations in London, ON
Interior Design Chennai
Demolition Services in UAE
construction company in Ontario
or need help with offshore and onshore services in the UAE
? Visit my site for expert advice and tailored solutions. Check it out today!
Xerox machine dealers in Chennai
RAT SMS offers an all-inclusive bulk SMS solution. We provide the tools and expertise you need to run effective transactional, promotional, or SMS marketing campaigns. Our platform's efficiency, scalability, and ease of use make it the ideal choice for businesses of all sizes. To learn how RAT SMS's bulk SMS services can enhance business communication and promote growth, get in touch with us right now.
https://www.ratsms.com/bulk-sms-service-provider