Aluminium Formwork System

1.   Aluminium Formwork System Step -1 :- Detail Drawing of Mock up Shuttering . Make Sure the building architectural & structural details shall be freezed before manufacturing / fabrication of Aluminum Shuttering. It could be cumbersome  while executing the works if there is any revision in drawing     Step 2:-   Lets start executing the formwork. Fixing of Vertical wall reinforcement shall be done. Step 3:-   Concrete Starters shall be done. Step -4 :- Fixing of Wall Panels as per above shown shuttering layout. Any electrical wall conduiting can be done prior to fixing of Aluminum Shuttering.          Step -5 :- Fixing of Slab Panels after erection of vertical wall panels Step 6:- Concrete can be done after slab shuttering & conduiting is done. Step 7:- Vertical walls can be removed (Deshuttering) after 24 hours of slab casting.   2.   Features of Alumi...

Mivan Shuttering Details

Details of Aluminum Formwork (Mivan / MFE) The most effective means available for the construction of high, medium and low rise mass housing R/C structures. It is a precision-engineered formwork fabricated in Aluminium. Monolithic pouring. Walls, columns, slabs & beam are poured together. Speed - Induces a disciplined & systemized approach to construction, which creates a daily work cycle, the essence of the productivity. The productivity generates a overall work cycle, that can achieve 4/5 day per floor outputs or other cycle times to suit your project requirements. It is flexible in design and can form any architectural or structural configuration, such as stairs, bay windows, curved features, etc. Quality - When struck the aluminium formwork reveals a good quality fair face onto which a 4–5mm skim coat can be applied for a perfect finish eliminating need of plaster. Provides an Integrated Scaffolding reducing the cost of your scaffoldi...