Can Grout replace concrete?

Can grout replace concrete in normal structure? The mixture of cement and water alone cannot replace concrete (Longman Scientific and Technical (1987)) because: (i) Shrinkage of grout is several times that of concrete with the same mass. (ii) The effect of creep of grout is far more than that of concrete. (iii) Heat of hydration of cement with water is more than normal concrete and this leads to  the problem of severe cracking .

Can Concrete Cover be increased beyond technical specification?

Is it good if increase concrete cover beyond contractual  specification (i.e. 40mm to 70mm), shall engineers accept the proposal? In contractual aspect, based on the requirement of General Specification of Civil Engineering Works (1992 Edition), the tolerance of concrete cover is between +5mm and –5mm and engineers should not accept sub-standard work because they do not possess the authority to change the acceptance criteria. In case engineers consider contractor’s proposal acceptable in technical point of view, consent has to be sought from the employer regarding the changes in acceptance criteria. From technical point of view, the effect on cracking due to an increase in concrete cover should be considered. In general, there are three main parameters which govern crack width, namely tensile strain at the point considered, the distance of longitudinal bar to the concerned point and the depth of tension zone. For the second factor, i.e. proximity of longitudinal bars to point...