Mivan Shuttering Details



Details of Aluminum Formwork (Mivan / MFE)

The most effective means available for the construction of high, medium and low rise mass housing R/C structures.
It is a precision-engineered formwork fabricated in Aluminium.
Monolithic pouring. Walls, columns, slabs & beam are poured together.
Speed - Induces a disciplined & systemized approach to construction, which creates a daily work cycle, the essence of the productivity. The productivity generates a overall work cycle, that can achieve 4/5 day per floor outputs or other cycle times to suit your project requirements.
It is flexible in design and can form any architectural or structural configuration, such as stairs, bay windows, curved features, etc.



Quality - When struck the aluminium formwork reveals a good quality fair face onto which a 4–5mm skim coat can be applied for a perfect finish eliminating need of plaster.
Provides an Integrated Scaffolding reducing the cost of your scaffolding requirements.
Ease of handling - The formwork panels are manually handled, generating further savings on heavy equipment and cranage.
Mechanical and electrical installation is simplified where conducts are embedded in the structure and by precise engineering of outlets and service ducts.

Cost Analysis:

Range is 155 US$ per m2 to 225 US$ per m2, most common being 160 US$ per m2 & assumed for cost comparison purpose.

Cost of Aluminum Formwork is 160 US $ per sqm.
Consider 65.00 Rs/US$. Add 25.0 % duties (+ Octroi/Entry Tax/Local Body Tax)
So Total Cost will be app 13,000 Rs/sqm. (160 X 65 X 1.25)
Your project offers 100 uses (for 10 blocks of 10 storey)
Final cost per sqm on item rate basis will be 130 Rs per sqm. ( Rs 13000 Formwork Cost/100 Uses) Depending on quality, traditional formwork (Plywood & Batten) costs between 80 & 150 Rs/sqm

To Workout Built up Area cost :-
For Col-beam-slab structure with simple elevation:
Ratio of Formwork Area to Builtup Area, on thumbrule base will be approximately 3 (It may be as high as 4.5 if elevation is features has double wall, double chhajja etc)
So Cost of Mivan Formwork per sft of builtup Area will be (3 X 13000/10.76) =3625 (One time Cost)
For 100 uses it will be 3625/ 100 = 36.25 Rs/sft of builtup area.

For Wall-slab structure with simple elevation:
Ratio of Formwork Area to Builtup Area, on thumbrule base will be approximately 5.5 (It may be as high as 7 if elevation is features has double wall, double chhajja, etc. Or low cost project where room dimensions are very small)
So Cost of Mivan Formwork per sft of builtup Area will be (5.5 X 13000/10.76) =6645 (One time Cost)
For 100 uses it will be 6645/ 100 = 66.45 Rs/sft of builtup area.

Construction period in above example:
1st Tower 1st slab – 21 days
2nd slab – 18 days
3rd slab – 15 days
4th slab – 12 days
5th slab – 9 days
6th to 25th slab – 140 days (@ 7 days per floor)
Total – 205 days = 7.88 months considering 26 working days per month.
Next each tower (25 slabs) – 175 days = 6.73 months considering 26 working days per month.
Total Period – 7.88 months for 1st tower + 3 X 6.73 months for subsequent towers
= 28.07 months, say 28 months.

Add about 4 months as time to reach typical floor of 1st tower & 6 months for finishing after last floor of 4th tower.

Total construction period will be about 38 months.


Conventionally, for 25 storey building, RCC will take about 2 years for including foundation & 12 months for finishing. That is 36 months. This means even after constructing one block at a time, total construction period is almost same as constructing all 4 towers simultaneously with traditional formwork. 

Comments

_Priya Raj_ said…
Dear author,
I am a student of Advanced Construction Management from India, and would like to know more about how you derived these calculations for aluminium shuttering.

-Priya Raj, India
priyaaa15@gmail.com
Madam,

The actual material cost is considered from mivan material supplying co & also based on practical experience (1 of my projects)

Rgds
Ram
Unknown said…
@yogesh Jain

Dear Priya

100% of built up area

30% of BUP area For walls i.e Twice for both side.

5% of BUP Area for Sills, Lintels.

Sum Up all Factors you get the ratio.
After watching the you tube and reading content on Mivan Shuttering, i concluded that it is useful mainly in multistoried buildings above 30 floors etc. that too commercial complexes or for luxury segment residential buildings with bigger carpet area's.

Initial Cost of Rs 1300/- per sft. is very high for residential buildings even if towers are 30 storied. It can only be useful if residential complex is spread over 60 acres and above.
Unknown said…


Hello,


We have gone through your site Mivan Shuttering Details. We are impressed & eager to use it in our next project which is at Nagpur, Maharashtra, India....

Please send the details of Mivan shuttering in per square feet super built up area for G+10 storied (12 buildings) with 15 Acres Land..

Thank You
Our Contact details are as follows:--

Email Id:- giplnagpur@gmail.com
Unknown said…
Hi,
My building is going for redevelopment, a very small plot and a project of 7 storey building. Can i ask my builder for mivan technology. Will it be too expensive for him?
Unknown said…
Hi,
My building is going for redevelopment, a very small plot and a project of 7 storey building. Can i ask my builder for mivan technology. Will it be too expensive for him?
Unknown said…
its costly , at par for 30 repetitions if if you have 30 slabs use this formwork
Jaiban Organics said…
Jaiban Organics utilizes the latest modern methods, solutions, and equipment in their aluminium shuttering chemical cleaning processes.

Aluminium shuttering cleaning solution to removing rust and concrete build-up on aluminium or mivan formwork. Aluminium shuttering cleaner quickly removes hardened concrete. Aluminium shuttering cleaner saving labour time in grinding and cleaning. The oxidation and corrosion of aluminium plate will not occur by using our chemical.
Jaiban Organics said…
Aluminium shuttering oil gives easy and clean surface of shutter. It ensures very high quality and good kind of concrete and with the help of it concrete becomes stain free and gives it fair faced as well.
Unknown said…
Hi sir,
U r asking about builtup rate per sq.ft. am I rate sir.buitup labour rate in mivan us about 190 /- per sq.ft. if company provides mivan material
NeevarP said…
While doing the designing for building using Mivan or equivalent, the building is designed as a monolithic building which considerably reduces the quantum of steel used in the project, which is quite a good amount.

2. It gives smooth surface and hence do not require plaster. It also reduces an time and the water which is a considerable amount.
Anonymous said…
We take this opportunity to introduce our self as a Distributor of BeSeal for Indian market.

BeSealed® is the product range of Bekina® Compounds, a renown Belgian rubber compounder. Bekina® Compounds has been producing Bentobar+, a bentonite waterstop for the construction industry, for over 25 years now. Because of the big demand of our waterstops, Bekina® Compounds decided to launch its own waterstop brand: BeSealed®

At this moment BeSealed® is being sold in 35 countries and this number is still growing

BeSealed® offer three different Product range

# Water Swellable Formwork products
# Swellable Sealing Bars
# Sealing Inserts for Tunneling

We attach here with detail Introductory letter , Brochure for your kind perusal and record.

Check out “BeSealed®, active sealing solutions” from BeSealed® on Vimeo.
The video is available for your viewing pleasure at https://vimeo.com/153339100

Please do contact us if you have any further questions.
Jaiban Organics said…
How to use Mivan shuttering cleaning chemical

1. Always use safety goggles, rubber gloves, shoes before handling this chemical.
2. Area of operation should be open & airy with good air circulation.
3. Deep aluminium shuttering piece.
4. Solution level should be 10 cm above the top aluminium shuttering piece.
5. Wait for 5 minutes.
6. Rinse with water & dry.
7. Dispose off solution after neutralizing the solution.
Anonymous said…
Dear Author

Could you please provide me the cost analysis of Mivan Shuttering on any Live project with details.
Please mail me on my mail id.
Because I am going to start Mivan shuttering in one my mass housing project.

Regards
Imran Khan
imran.khan@rtechgroup.co.in
Unknown said…
What is the sutar and fitar rate for mivan construction of 23 floor building
Unknown said…
I read your post,Thanks for sharing this.
Unknown said…
Very Nice & useful technical information Sir. Thank you very much God bless you. Hari Om
Unknown said…
Did u find any documents on MIVAN cost analysis? Could you please share if you have any?

Regards,
Vamshi
vamshidhar994@gmail.com
sara patil said…
Nice post thanks for sharing
Cosmos is one of the best leading Testing equipment manufacturers Manufacturers in Pune,Testing equipment suppliersin pune, Testing equipment in pune, Testing equipment.
Testing equipment manufacturers in pune
Testing equipment suppliers in pune
Testing equipment
Testing equipment in pune
Testing equipment in india
Unknown said…
boy why did u copied this content from scribd
ziaadesty said…

I really like all of your writing. I hope you don't get bored to always share your experiences with me. Don't forget to visit my website below:

https://www.merpatiku.my.id

https://www.petsofusa.com

https://www.healthzia.net

https://www.celanapria.my.id
Unknown said…
Hi sir..pls tell me what is mivon Construction only labour rate basis...shuttering provided by company...area of one slab is 7000sq.ft and this building is 8 storyed...pls tell me guidence..
Unknown said…
Nice knowledge for mivan shuttering. I am project Engr.at Mumbai. About 48 years experience in Construction fields. Once again good knowledge to the beginners. Thanks.
Unknown said…
PLEASE GIVE ME YOUR PHONE NO
Karamjit Singh said…
Without a construction contractors it becomes difficult to get completed construction work on time. That is why we provide experienced and professional contractors for new build, Refurbishment Services Uxbridge, and extensions in London.
lcrenovation said…
I really like all of your writing. I hope you don't get bored to always share your experiences with me. Don't forget to visit my website below:
House Renovations in Wimbledon
Aaaaccounting said…
Thanks for sharing your blog so interesting. After looking through different websites I finally found something worth reading.
Accounting services in barking
james cristine said…
Thanks for sharing this valuable blog, Best home extension contractor offers affordable building services Southend on Sea. Contact us today!
Loft Conversions Southend on Sea
james cristine said…
Thanks for sharing this valuable blog, Best home extension contractor offers affordable building services Southend on Sea. Contact us today!
Best loft conversions Southend
Aaaaccounting said…
Great collection of living room furniture. Modern style Dining Chairs Online furniture is highly fashionable yet comfortable & very trendy in nature
tax return service in barking
Gold apple said…
This comment has been removed by the author.
Ander Son said…
Great job tackling this complex theme. So much nuance and layers involved. I have mixed views after thinking it through more deeply. You raised some excellent perspectives to ponder. Discussions like this help people to look at issues from different angles.
clear tarpaulin
Iron Man said…
Great article! I really enjoyed reading it. You provided some valuable insights that I hadn't considered before. Thanks for sharing!
heavy duty tarpaulin
Manufacturer said…
Greate article!!! I bought PP Leno Mesh Bagsfor both personal and business use. They’re perfect for storing fruits, veggies, and even hardware. Durable, affordable, and eco-friendly. Couldn’t ask for more!

Popular posts from this blog

Construction Sequence of MEP works in Buildings

Typical Construction Sequence for Mechanical / Electrical / Plumbing Works in High Rise Building Grouping of MEP Fixes like PVC Electrical conduits in Slabs : 1. MEP 1st Fix - All Concealed Items/Pipe Sleeves in Verticals/Horizontals (Column/Slab) 2. MEP 2nd Fix - Stage 1: High Level MEP Works at False Ceiling i) Fixing supports, installation of Firefighting, Chilled Water piping, drainage pipes, water supply(hot & cold), rain water, cable ladders, G.I Conduiting, AC ducting ii) Pressure tests and insulations iii) Installation of FCUs, water heaters (Note: False Ceiling people will fix runners after the Stage 1 of MEP 2nd Fix) 3. MEP 2nd Fix - Stage 2: Clearance for False Ceiling People i) Sprinkler droppers, AC duct droppers, flexible cable for light fixtures, fire stopping and identification works etc. (Note: False Ceiling people will close ceiling tiles and MEP people will connect their diffusers in position on the ceiling tiles - too much coordination is required at

List of Top 200 Construction Companies in the world

The world's 200 largest construction companies Position Company Country 2007 Posit ion Change 1 Vinci France 1 - 2 Bouygues' Construction Divisions France 2 - 3 ACS Spain 5 2 4 Bechtel US 3 -1 5 China Rail way Group China 6 1 6 China Rail way Construction Corporation China 23 17 7 Hochtief Germany 4 -3 8 Ferrovial Spain 11 3 9 China Co mmunications Construction Group China 14 5 10 Skanska Sweden 9 -1 11 FCC Spain 25 14 12 China Stat e Construction & Engineering (CSCEC) China 13 1 13 Eiffage France 21 8 14 Kajima Co rporation Japan 8 -6 15 Fluor US 17 2 16 Strabag S E Austria 22 6 17 Taisei Cor poration Japan 10 -7 18