Skill Set
|
Education
|
Junior
|
Middle
|
Senior
|
||||||
Exp (Yrs)
|
Min. Salary
|
Max. Salary
|
Exp (Yrs)
|
Min. Salary
|
Max. Salary
|
Exp (Yrs)
|
Min. Salary
|
Max. Salary
|
||
ENGINEERING SERVICES
|
||||||||||
Manufacturing
|
BE / ME Mechanical
|
6-8
|
5.00
|
8.00
|
12-14
|
8.00
|
10.00
|
15-18
|
16.00
|
20.00
|
Production
|
BE / ME Production / Mechanical
|
6-8
|
5.00
|
8.00
|
10-12
|
9.00
|
12.00
|
13-16
|
15.00
|
18.00
|
Maintenance
|
BE Mechanical / Electrical
|
6-8
|
5.00
|
8.00
|
8-10
|
6.00
|
8.00
|
14-17
|
15.00
|
18.00
|
Quality
|
BE Mechanical / Electrical
|
6-8
|
5.00
|
8.00
|
10-12
|
7.00
|
10.00
|
14-16
|
16.00
|
22.00
|
Process
|
BE Mechanical / Electrical
|
6-8
|
5.00
|
8.00
|
10-13
|
7.00
|
10.00
|
15-18
|
14.00
|
17.00
|
Automation
|
BE Mechanical / Automation
|
6-7
|
5.00
|
8.00
|
8-10
|
6.00
|
8.00
|
12-15
|
13.00
|
16.00
|
Design
|
BE Mechanical / Electrical
|
6-8
|
5.00
|
8.00
|
10-12
|
7.00
|
10.00
|
14-17
|
15.00
|
22.00
|
Project
|
BE Mechanical / Electrical /
Chemical
|
6-7
|
5.00
|
8.00
|
8-10
|
6.00
|
8.00
|
12-15
|
15.00
|
20.00
|
Materials
|
BE Mechanical
|
6-7
|
5.00
|
8.00
|
8-9
|
6.00
|
8.00
|
10-13
|
10.00
|
14.00
|
Purchase
|
BE Mechanical
|
7-8
|
5.00
|
8.00
|
7-8
|
5.00
|
8.00
|
10-12
|
10.00
|
14.00
|
Validation
|
BE Chemical / Mechanical
|
5-6
|
4.00
|
7.00
|
10-12
|
7.00
|
10.00
|
12-16
|
10.00
|
15.00
|
Instrumentation Engineer
|
BE Instrumentation
|
6-7
|
5.00
|
8.00
|
8-9
|
6.00
|
8.00
|
10-12
|
9.00
|
13.00
|
Electrical Engineer
|
BE Electrical
|
5-6
|
4.00
|
7.00
|
7-8
|
5.00
|
8.00
|
8-10
|
8.00
|
12.00
|
Mechanical Engineer
|
BE Mechanical
|
5-7
|
4.00
|
7.00
|
7-8
|
5.00
|
8.00
|
8-10
|
8.00
|
12.00
|
Civil Engineer
|
BE Civil
|
5-6
|
4.50
|
7.00
|
7-8
|
5.00
|
8.00
|
8-10
|
8.00
|
12.00
|
Paint Shop
|
BE Mechanical
|
6-7
|
5.00
|
8.00
|
8-10
|
6.00
|
8.00
|
10-12
|
9.00
|
12.00
|
New Product Introduction
|
BE Mechanical
|
7-8
|
5.00
|
8.00
|
10-12
|
7.00
|
12.00
|
12-15
|
10.00
|
14.00
|
Piping
|
BE Mechanical
|
7-8
|
5.00
|
8.00
|
10-12
|
7.00
|
12.00
|
13-16
|
11.00
|
14.00
|
Welding
|
BE Mechanical / Electrical
|
6-7
|
5.00
|
8.00
|
6-8
|
5.00
|
7.00
|
8-10
|
8.00
|
11.00
|
Supplier Quality
|
BE Mechanical
|
5-6
|
4.50
|
7.00
|
10-13
|
7.00
|
10.00
|
15-18
|
14.00
|
17.00
|
Plant Engineering
|
BE Mechanical / Electrical
|
5-6
|
4.50
|
7.00
|
10-12
|
7.00
|
10.00
|
14-16
|
13.00
|
16.00
|
Health Safety and Environment
|
BE Environmental
|
6-7
|
4.50
|
7.00
|
10-12
|
7.00
|
10.00
|
13-15
|
11.00
|
14.00
|
Logistics
|
BE Mechanical
|
5-6
|
4.00
|
7.00
|
12-15
|
8.00
|
10.00
|
16-20
|
12.00
|
15.00
|
Fire & Safety
|
BE Mechanical
|
5-6
|
4.00
|
7.00
|
8-10
|
6.00
|
8.00
|
10-12
|
9.00
|
13.00
|
Supply Chain Management
|
BE Mechanical
|
7-8
|
5.00
|
8.00
|
10-12
|
7.00
|
10.00
|
14-16
|
10.00
|
14.00
|
Shift supervisor plant engineering
|
BE Mechanical
|
6-7
|
5.00
|
8.00
|
8-9
|
6.00
|
8.00
|
10-12
|
9.00
|
13.00
|
Plant Inspection
|
BE Mechanical
|
6-7
|
5.00
|
8.00
|
8-10
|
6.00
|
8.00
|
12-15
|
13.00
|
16.00
|
Planning
|
BE Mechanical / Electrical
|
5-6
|
4.00
|
7.00
|
10-12
|
7.00
|
10.00
|
14-16
|
12.00
|
16.00
|
Business Development
|
BE Mechanical
|
5-6
|
4.00
|
7.00
|
10-12
|
7.00
|
10.00
|
13-16
|
10.00
|
14.00
|
Technical
|
BE Mechanical
|
7-8
|
5.00
|
8.00
|
12-15
|
8.00
|
10.00
|
15-19
|
14.00
|
17.00
|
Sales
|
BE Mechanical
|
6-7
|
5.00
|
8.00
|
10-12
|
7.00
|
10.00
|
16-18
|
16.00
|
20.00
|
Marketing
|
BE Mechanical
|
5-6
|
4.00
|
7.00
|
10-12
|
7.00
|
10.00
|
14-16
|
13.00
|
16.00
|
Design & Engineering
|
BE Mechanical / Electrical
|
7-8
|
5.00
|
8.00
|
12-15
|
8.00
|
10.00
|
18-20
|
18.00
|
25.00
|
PPC
|
BE Mechanical
|
8-9
|
5.00
|
8.00
|
12-14
|
8.00
|
10.00
|
18-19
|
16.00
|
20.00
|
Typical Construction Sequence for Mechanical / Electrical / Plumbing Works in High Rise Building Grouping of MEP Fixes like PVC Electrical conduits in Slabs : 1. MEP 1st Fix - All Concealed Items/Pipe Sleeves in Verticals/Horizontals (Column/Slab) 2. MEP 2nd Fix - Stage 1: High Level MEP Works at False Ceiling i) Fixing supports, installation of Firefighting, Chilled Water piping, drainage pipes, water supply(hot & cold), rain water, cable ladders, G.I Conduiting, AC ducting ii) Pressure tests and insulations iii) Installation of FCUs, water heaters (Note: False Ceiling people will fix runners after the Stage 1 of MEP 2nd Fix) 3. MEP 2nd Fix - Stage 2: Clearance for False Ceiling People i) Sprinkler droppers, AC duct droppers, flexible cable for light fixtures, fire stopping and identification works etc. (Note: False Ceiling people will close ceiling tiles and MEP people will connect their diffusers in position on the ceiling tiles - too much coordination is required at ...
Comments
Is it pay scale month or year?
sorry for replying so late...
Its in INR Lacs(Indian Rupees - Lacs).
1 Lac Rs = 100,000/- Rs
URL: https://sivanidevelopers.com
email:vizagbuilders@sivanidevelopers.com
Contact # +91 8498850689