Skill Set
|
Education
|
Junior
|
Middle
|
||||
Exp (Yrs)
|
Min. Salary
|
Max. Salary
|
Exp (Yrs)
|
Min. Salary
|
Max. Salary
|
||
SOFTWARE DEVELOPMENT
|
|||||||
Android Developers
|
BE / B.Tech / Any Graduation
|
4-8
|
5.00
|
14.00
|
8-15
|
12.00
|
25.00
|
iPhone Developers
|
BE / B.Tech / Any Graduation
|
4-8
|
7.00
|
16.00
|
8-15
|
12.00
|
24.00
|
Java
|
BE / B.Tech / MCA
|
4-8
|
3.00
|
14.00
|
8-15
|
10.00
|
22.00
|
.NET
|
BE / B.Tech / MCA
|
4-8
|
3.00
|
11.00
|
8-15
|
11.00
|
19.00
|
C
|
BE / B.Tech / MCA
|
4-8
|
3.00
|
14.00
|
8-15
|
14.00
|
30.00
|
C++
|
BE / B.Tech / MCA
|
4-8
|
6.00
|
12.00
|
8-15
|
12.00
|
23.00
|
PHP
|
BE / B.Tech / Any Graduation
|
4-8
|
3.00
|
10.00
|
8-15
|
9.00
|
19.00
|
Embeded C
|
BE / B.Tech / MCA
|
4-8
|
6.00
|
12.00
|
8-15
|
10.00
|
20.00
|
Perl
|
BE / B.Tech / MCA
|
4-8
|
6.00
|
12.00
|
8-15
|
14.00
|
28.00
|
Python
|
BE / B.Tech / MCA
|
4-8
|
7.00
|
14.00
|
8-15
|
12.00
|
24.00
|
VB programming
|
BE / B.Tech / Any Graduation
|
4-8
|
4.00
|
8.00
|
8-15
|
10.00
|
15.00
|
VC++
|
BE / B.Tech / MCA
|
4-8
|
5.00
|
9.00
|
8-15
|
10.00
|
25.00
|
PL /SQL Developers
|
BE / B.Tech / MCA
|
4-8
|
4.00
|
9.00
|
8-15
|
9.00
|
20.00
|
Powerbuilder
|
BE / B.Tech / MCA
|
4-8
|
4.00
|
12.00
|
8-15
|
11.00
|
20.00
|
AS /400 cobol
|
BE / B.Tech / MCA
|
4-8
|
4.00
|
10.00
|
8-15
|
13.00
|
28.00
|
Flex
|
BE / B.Tech / MCA
|
4-8
|
4.00
|
11.00
|
8-15
|
10.00
|
23.00
|
Pega
|
BE / B.Tech / MCA
|
4-8
|
6.00
|
14.00
|
8-15
|
18.00
|
35.00
|
Sybase Unwired, Java,android
|
BE / B.Tech / MCA
|
4-8
|
8.00
|
16.00
|
8-15
|
15.00
|
30.00
|
Typical Construction Sequence for Mechanical / Electrical / Plumbing Works in High Rise Building Grouping of MEP Fixes like PVC Electrical conduits in Slabs : 1. MEP 1st Fix - All Concealed Items/Pipe Sleeves in Verticals/Horizontals (Column/Slab) 2. MEP 2nd Fix - Stage 1: High Level MEP Works at False Ceiling i) Fixing supports, installation of Firefighting, Chilled Water piping, drainage pipes, water supply(hot & cold), rain water, cable ladders, G.I Conduiting, AC ducting ii) Pressure tests and insulations iii) Installation of FCUs, water heaters (Note: False Ceiling people will fix runners after the Stage 1 of MEP 2nd Fix) 3. MEP 2nd Fix - Stage 2: Clearance for False Ceiling People i) Sprinkler droppers, AC duct droppers, flexible cable for light fixtures, fire stopping and identification works etc. (Note: False Ceiling people will close ceiling tiles and MEP people will connect their diffusers in position on the ceiling tiles - too much coordination is required at
Comments