Sl.No
|
Skill Set
|
Education
|
Junior
|
Middle
|
Senior
|
||||||
Exp (Yrs)
|
Min. Salary
|
Max. Salary
|
Exp (Yrs)
|
Min. Salary
|
Max. Salary
|
Exp (Yrs)
|
Min. Salary
|
Max. Salary
|
|||
TESTING
|
|||||||||||
1
|
Manual testing
|
BE / B.Tech / Any Graduation
|
4-8
|
5.00
|
9.00
|
-
|
-
|
-
|
-
|
-
|
-
|
2
|
Automation testing
|
BE / B.Tech / Any Graduation
|
4-8
|
6.00
|
12.00
|
-
|
-
|
-
|
-
|
-
|
-
|
3
|
Performance Testing
|
BE / B.Tech / Any Graduation
|
4-8
|
6.00
|
11.00
|
-
|
-
|
-
|
-
|
-
|
-
|
4
|
Security testing
|
BE / B.Tech / Any Graduation
|
4-8
|
6.00
|
12.00
|
-
|
-
|
-
|
-
|
-
|
-
|
5
|
Black Box testing
|
BE / B.Tech / Any Graduation
|
4-8
|
6.00
|
11.00
|
-
|
-
|
-
|
-
|
-
|
-
|
6
|
Embedded Testing
|
BE / B.Tech / Any Graduation
|
4-8
|
9.00
|
17.00
|
-
|
-
|
-
|
-
|
-
|
-
|
7
|
Mobile testing
|
BE / B.Tech / Any Graduation
|
4-8
|
8.00
|
15.00
|
-
|
-
|
-
|
-
|
-
|
-
|
Details of Aluminum Formwork (Mivan / MFE) The most effective means available for the construction of high, medium and low rise mass housing R/C structures. It is a precision-engineered formwork fabricated in Aluminium. Monolithic pouring. Walls, columns, slabs & beam are poured together. Speed - Induces a disciplined & systemized approach to construction, which creates a daily work cycle, the essence of the productivity. The productivity generates a overall work cycle, that can achieve 4/5 day per floor outputs or other cycle times to suit your project requirements. It is flexible in design and can form any architectural or structural configuration, such as stairs, bay windows, curved features, etc. Quality - When struck the aluminium formwork reveals a good quality fair face onto which a 4–5mm skim coat can be applied for a perfect finish eliminating need of plaster. Provides an Integrated Scaffolding reducing the cost of your scaffoldi...
Comments