Skip to main content

Usage space in Tallest Buidings



Vanity Height: the Use-less Space in Today’s Tallest Buildings
It is noticed at Jeddah Kingdom tower, that a fair amount of the top of the building seemed to be an unoccupied spire. This prompted us to investigate the increasing trend towards extreme spires and other extensions of tall buildings that do not enclose usable space, and create a new term to describe this – Vanity Height, i.e., the distance between a skyscraper’s highest occupiable floor and its architectural top, as determined by Height Criteria.


Greatest Supertall
Vanity Ratio

With a vanity height of nearly 124 meters within its architectural height of 321 meters, the Burj Al Arab has the highest non-occupiable-to-occupiable height ratio among completed supertalls. 39% of its height is non-occupiable.
Figure 2. World’s Ten Tallest Vanity Heights
The ten tallest “Vanity Heights” in today’s completed supertalls as of July 2013 data.
* The highest occupied floor height as datum line.
** The highest occupied floor height.
Figure 3. History of Vanity Height
This chart shows Vanity Height as a percentage of overall architectural height for the world’s 74 completed supertalls.
Note: Historically there have been 74 completed supertalls (300+ m) in the world, including the now-demolished One and Two World Trade Center in New York.
Figure 4. Vanity Height in Detail
These graphs examine the average Vanity Height of completed supertalls by country, date of completion, and architectural height.

Comments

Chyna Reinger said…
I don’t even know how I ended up here, but I thought this post was good. I don't know who you are but definitely you're going to a famous blogger if you are not already ;) Cheers! Alexandr Shcolyar

Popular posts from this blog

Construction Sequence of MEP works in Buildings

Typical Construction Sequence for Mechanical / Electrical / Plumbing Works in High Rise Building Grouping of MEP Fixes like PVC Electrical conduits in Slabs : 1. MEP 1st Fix - All Concealed Items/Pipe Sleeves in Verticals/Horizontals (Column/Slab) 2. MEP 2nd Fix - Stage 1: High Level MEP Works at False Ceiling i) Fixing supports, installation of Firefighting, Chilled Water piping, drainage pipes, water supply(hot & cold), rain water, cable ladders, G.I Conduiting, AC ducting ii) Pressure tests and insulations iii) Installation of FCUs, water heaters (Note: False Ceiling people will fix runners after the Stage 1 of MEP 2nd Fix) 3. MEP 2nd Fix - Stage 2: Clearance for False Ceiling People i) Sprinkler droppers, AC duct droppers, flexible cable for light fixtures, fire stopping and identification works etc. (Note: False Ceiling people will close ceiling tiles and MEP people will connect their diffusers in position on the ceiling tiles - too much coordination is required at

List of Top 200 Construction Companies in the world

The world's 200 largest construction companies Position Company Country 2007 Posit ion Change 1 Vinci France 1 - 2 Bouygues' Construction Divisions France 2 - 3 ACS Spain 5 2 4 Bechtel US 3 -1 5 China Rail way Group China 6 1 6 China Rail way Construction Corporation China 23 17 7 Hochtief Germany 4 -3 8 Ferrovial Spain 11 3 9 China Co mmunications Construction Group China 14 5 10 Skanska Sweden 9 -1 11 FCC Spain 25 14 12 China Stat e Construction & Engineering (CSCEC) China 13 1 13 Eiffage France 21 8 14 Kajima Co rporation Japan 8 -6 15 Fluor US 17 2 16 Strabag S E Austria 22 6 17 Taisei Cor poration Japan 10 -7 18

Tallest Building under construction