Skip to main content

House in the Mountains - Concept Houses



Houses embedded in the earth are becoming a fashion.




The reasons are compelling–the grass roofs reduce energy loads and their low profile doesn't impinge on the natural landscape.
In the case of a 2,850-square-foot guesthouse in the Colorado Rocky Mountains, the clients, for whom Gluck had designed a main house on the site in 2004, wanted a separate structure to be located on property to the south between a creek and an access road. But they didn't want it to interfere with the splendid mountain vista they had from the main house. “So many views are destroyed by plunking buildings on top of the land,”




The architects configured the guesthouse as two rectilinear steel-framed bars that intersect; the primary one contains open living and dining spaces, with a roof gradually rising to the south at a 20-degree angle. The volume seems to collide with and lift over a rectilinear structure running east–west on a diagonal, which contains three bedrooms and the garage. A wall of solar panels on the south elevation of the bedroom wing supplies heat for the house and swimming pool.




The living and dining areas, anchored by a bluestone fireplace wall on the north, open out through glazed doors to the pool on the east and a private, sunken, triangular courtyard on the west. Cor-Ten clads the courtyard's slanted retaining wall, into which an outdoor fireplace is carved.


 Just beneath the Cor-Ten fascia of the house's roofs, clerestories frame panoramic views of the mountains. “It's become more than a guesthouse,” says Gluck. “It's a communal space for the family.”

Comments

Popular posts from this blog

Construction Sequence of MEP works in Buildings

Typical Construction Sequence for Mechanical / Electrical / Plumbing Works in High Rise Building Grouping of MEP Fixes like PVC Electrical conduits in Slabs : 1. MEP 1st Fix - All Concealed Items/Pipe Sleeves in Verticals/Horizontals (Column/Slab) 2. MEP 2nd Fix - Stage 1: High Level MEP Works at False Ceiling i) Fixing supports, installation of Firefighting, Chilled Water piping, drainage pipes, water supply(hot & cold), rain water, cable ladders, G.I Conduiting, AC ducting ii) Pressure tests and insulations iii) Installation of FCUs, water heaters (Note: False Ceiling people will fix runners after the Stage 1 of MEP 2nd Fix) 3. MEP 2nd Fix - Stage 2: Clearance for False Ceiling People i) Sprinkler droppers, AC duct droppers, flexible cable for light fixtures, fire stopping and identification works etc. (Note: False Ceiling people will close ceiling tiles and MEP people will connect their diffusers in position on the ceiling tiles - too much coordination is required at

List of Top 200 Construction Companies in the world

The world's 200 largest construction companies Position Company Country 2007 Posit ion Change 1 Vinci France 1 - 2 Bouygues' Construction Divisions France 2 - 3 ACS Spain 5 2 4 Bechtel US 3 -1 5 China Rail way Group China 6 1 6 China Rail way Construction Corporation China 23 17 7 Hochtief Germany 4 -3 8 Ferrovial Spain 11 3 9 China Co mmunications Construction Group China 14 5 10 Skanska Sweden 9 -1 11 FCC Spain 25 14 12 China Stat e Construction & Engineering (CSCEC) China 13 1 13 Eiffage France 21 8 14 Kajima Co rporation Japan 8 -6 15 Fluor US 17 2 16 Strabag S E Austria 22 6 17 Taisei Cor poration Japan 10 -7 18

Tallest Building under construction