Skip to main content

Posts

MS Project for Construction

MS PROJECT FOR CONSTRUCTION SCHEDULERS Table of Contents List of Tables                                ................iii List of Figures                               ................iv Abstract                                        ................v 1. Introduction ................1 2. MS Project Differences ................2 3. Tracking a schedule with MS Project ................4 3.1. Schedule Set-up ................5 3.2. Setting a Baseline ................8 3.3. Updating the schedule ................10 3.3.1. Updating Tasks ................10 3.3.2. Observing the Status Date ................15 3.3.2.1. Reschedule Uncompleted Work to Start After .......
What is Carpet Area, Built Up Area & Super Built Up Area? The terms built up area, super built up area, salable area and carpet area pop up again and again for an Indian real estate buyer. The apartment that is sold as a spacious 1500 sqft apartment, is actually not 1500 sqft if you count its actual covered area, or carpet area. Carpet Area is the area enclosed within the walls, actual area to lay the carpet. This area does not include the thickness of the inner walls. It is the actual used area of an apartment/office unit/showroom etc. Built up Area is the carpet area plus the thickness of outer walls and the balcony. Super Built Up Area is the built up area plus proportionate area of common areas such as the lobby, lifts shaft, stairs, etc. The plinth area along with a share of all common areas proportionately divided amongst all unit owners makes up the Super Built-up area. Sometimes it may also include the common areas such, swimming pool, garden, clubhouse, e...

Hyderabad Metro Rail

Features of Hyderabad Metro Rail :-  Hyderabad Metro Rail (MRTS) project is planned in three high density traffic corridors of the city spanning across 72 km in phase-I.  • The three corridors spanning a length of approximately 72 km to be taken up in phase-I are as under.  Corridor I: Miyapur – LB Nagar : 29 kms; 27 stations.  Corridor II: JBS – Falaknuma : 15 kms; 16 stations.  Corridor III: Nagole – Shilparamam : 28 kms; 23 stations. • The Metro rail system under construction is a completely elevated system, generally run in the central median of the road.  • The track gauge is a Standard Gauge (1435 mm).  • Stations are located at an average interval of 1KM – elevated stations with passenger access through staircases, escalators and lifts; • With a frequency of 3 to 5 minutes during peak hours, the system is expected to carry about 17 lakh passengers per day by 2017 and 22 lakh by 2024;  • Wi...