Tallest Building - Really??



 - Concept Stage

The X-Seed 4000 is the tallest building ever fully envisioned, meaning that the designs for construction have been completed. The idea was initially created and developed by Peter Neville. Its proposed 4 km (2.5 mi) height, 6 km (3.7 mi) wide sea-base, and 800 floor capacity could accommodate five hundred thousand to one million inhabitants.
It was designed for Tokyo, Japan by the Taisei Corporation in 1995 as a futuristic environment combining ultra-modern living and interaction with nature.
The X-Seed 4000 "is never meant to be built," says Georges Binder, managing director of Buildings & Data, a firm which compiles data banks on buildings worldwide. "The purpose of the plan was to earn some recognition for the firm, and it worked."
Unlike conventional skyscrapers, the X-Seed 4000 would be required to actively protect its occupants from considerable air pressure gradations and weather fluctuations along its massive elevation. Its design calls for the use of solar power to maintain internal environmental conditions. Also, the proposed area is situated on the Pacific Ring of Fire, which is the most active volcano range in the world so X-Seed 4000 would be subject to tsunamis and earthquakes. The Shimizu Mega-City Pyramid (also planned for Tokyo, Japan) faces the same problems.
A sea-based location and a Mount Fuji shape are some of this building's other major design features — the real Mount Fuji is land-based and is 3776 m (2.35 miles) high, 224 m shorter than X-Seed 4000. The X-Seed 4000 is projected to be twice the height of the Shimizu Mega-City Pyramid at 2004 m. Other projects that may be in the top five man made structures are the Dubai City Tower (2400 m) and the Bionic Tower (1128 m) in either Hong Kong or Shanghai. These structures will all be in Asia.

Comments

Popular posts from this blog

Construction Sequence of MEP works in Buildings

Typical Construction Sequence for Mechanical / Electrical / Plumbing Works in High Rise Building Grouping of MEP Fixes like PVC Electrical conduits in Slabs : 1. MEP 1st Fix - All Concealed Items/Pipe Sleeves in Verticals/Horizontals (Column/Slab) 2. MEP 2nd Fix - Stage 1: High Level MEP Works at False Ceiling i) Fixing supports, installation of Firefighting, Chilled Water piping, drainage pipes, water supply(hot & cold), rain water, cable ladders, G.I Conduiting, AC ducting ii) Pressure tests and insulations iii) Installation of FCUs, water heaters (Note: False Ceiling people will fix runners after the Stage 1 of MEP 2nd Fix) 3. MEP 2nd Fix - Stage 2: Clearance for False Ceiling People i) Sprinkler droppers, AC duct droppers, flexible cable for light fixtures, fire stopping and identification works etc. (Note: False Ceiling people will close ceiling tiles and MEP people will connect their diffusers in position on the ceiling tiles - too much coordination is required at ...

Mivan Shuttering Details

Details of Aluminum Formwork (Mivan / MFE) The most effective means available for the construction of high, medium and low rise mass housing R/C structures. It is a precision-engineered formwork fabricated in Aluminium. Monolithic pouring. Walls, columns, slabs & beam are poured together. Speed - Induces a disciplined & systemized approach to construction, which creates a daily work cycle, the essence of the productivity. The productivity generates a overall work cycle, that can achieve 4/5 day per floor outputs or other cycle times to suit your project requirements. It is flexible in design and can form any architectural or structural configuration, such as stairs, bay windows, curved features, etc. Quality - When struck the aluminium formwork reveals a good quality fair face onto which a 4–5mm skim coat can be applied for a perfect finish eliminating need of plaster. Provides an Integrated Scaffolding reducing the cost of your scaffoldi...

List of Top 200 Construction Companies in the world

The world's 200 largest construction companies Position Company Country 2007 Posit ion Change 1 Vinci France 1 - 2 Bouygues' Construction Divisions France 2 - 3 ACS Spain 5 2 4 Bechtel US 3 -1 5 China Rail way Group China 6 1 6 China Rail way Construction Corporation China 23 17 7 Hochtief Germany 4 -3 8 Ferrovial Spain 11 3 9 China Co mmunications Construction Group China 14 5 10 Skanska Sweden 9 -1 11 FCC Spain 25 14 12 China Stat e Construction & Engineering (CSCEC) China 13 1 13 Eiffage France 21 8 14 Kajima Co rporation Japan 8 -6 15 Fluor US 17 2 16 Strabag S E Austria 22 6 17 Taisei Cor poration Japan 10 -7 18...