Skip to main content

Bhuj Dubai


DUBAI – BHUJ DUBAI

· Burj Dubai is only a small part of what's beeing constructed in Dubai, the amusement park Dubai land will be twice the size of Walt Disney World in Florida and Dubai Mall the largest department store in the world of which both of them already are under construction.

· Architect: Adrian Smith (SOM).
Construction :
2004-30.12.2008
Construction Company: Samsung E&C(Korean Co).
Cost : $8 billion compared to Petronas Tower 1.6 billion back in 1998.
Design company: Skidmore, Owings, and Merrill (SOM).
Elevators : 66 double deckers moving at the speed of 18m/s (40mph), making it the worlds fastest.
Facade: Ferroconcrete, steel-frame.
Floors : 110*
Foundation: Concrete with 55 m(84 ft)tall piles attached into the ground.
Frame: Reflecting glazing to cool and save energy.
Gross Floor Space: 314,000 m² (3,378,137.6 sqft).
Height :
705 m (2,313 ft)*.
Observation deck: Indoor and outdoor at the 124 th floor, 34 floors abow the current leader Taipei 101.
Project size: 190 hectares including artificial lake and downtown Dubai.

  • The concrete used for the Burj Dubai is equivalent to: a solid cube of concrete 61 metres on a side, a sidewalk 1,900 kilometres long, the weight of 100,000 elephants.

· Reinforcement Steel :- 31,400 MT - laid end to end this would extend over a quarter of the way around the world.

  • The tip of the spire will be visible up to 95 kilometres away.

  • The Burj Dubai will house around 35,000 people upon completion.

  • The tower's observation deck will be located 442 metres above ground, the highest publicly accessible observation deck in the world.

  • The amount of steel rebar used for the tower is 31,400 metric tons - laid end to end this would extend over a quarter of the way around the world.

  • Dubai has set a new world record for vertical concrete pumping for a building, by pumping to over 460 metres. The previous record was held by Taipei 101 for pumping concrete up to a height of 448 metres.

  • The total area of cladding used to cover the Burj Dubai will be equivalent to 17 football fields.

Comments

autolinkint said…
This is such a great resource that you providing and you give it away for free. I love seeing websites that understand the value of providing a quality resource for free. It is the old what goes around comes around routine.
Used Concrete Pumps in Dubai

Popular posts from this blog

Construction Sequence of MEP works in Buildings

Typical Construction Sequence for Mechanical / Electrical / Plumbing Works in High Rise Building Grouping of MEP Fixes like PVC Electrical conduits in Slabs : 1. MEP 1st Fix - All Concealed Items/Pipe Sleeves in Verticals/Horizontals (Column/Slab) 2. MEP 2nd Fix - Stage 1: High Level MEP Works at False Ceiling i) Fixing supports, installation of Firefighting, Chilled Water piping, drainage pipes, water supply(hot & cold), rain water, cable ladders, G.I Conduiting, AC ducting ii) Pressure tests and insulations iii) Installation of FCUs, water heaters (Note: False Ceiling people will fix runners after the Stage 1 of MEP 2nd Fix) 3. MEP 2nd Fix - Stage 2: Clearance for False Ceiling People i) Sprinkler droppers, AC duct droppers, flexible cable for light fixtures, fire stopping and identification works etc. (Note: False Ceiling people will close ceiling tiles and MEP people will connect their diffusers in position on the ceiling tiles - too much coordination is required at

Mivan Shuttering Details

Details of Aluminum Formwork (Mivan / MFE) The most effective means available for the construction of high, medium and low rise mass housing R/C structures. It is a precision-engineered formwork fabricated in Aluminium. Monolithic pouring. Walls, columns, slabs & beam are poured together. Speed - Induces a disciplined & systemized approach to construction, which creates a daily work cycle, the essence of the productivity. The productivity generates a overall work cycle, that can achieve 4/5 day per floor outputs or other cycle times to suit your project requirements. It is flexible in design and can form any architectural or structural configuration, such as stairs, bay windows, curved features, etc. Quality - When struck the aluminium formwork reveals a good quality fair face onto which a 4–5mm skim coat can be applied for a perfect finish eliminating need of plaster. Provides an Integrated Scaffolding reducing the cost of your scaffoldi

List of Top 200 Construction Companies in the world

The world's 200 largest construction companies Position Company Country 2007 Posit ion Change 1 Vinci France 1 - 2 Bouygues' Construction Divisions France 2 - 3 ACS Spain 5 2 4 Bechtel US 3 -1 5 China Rail way Group China 6 1 6 China Rail way Construction Corporation China 23 17 7 Hochtief Germany 4 -3 8 Ferrovial Spain 11 3 9 China Co mmunications Construction Group China 14 5 10 Skanska Sweden 9 -1 11 FCC Spain 25 14 12 China Stat e Construction & Engineering (CSCEC) China 13 1 13 Eiffage France 21 8 14 Kajima Co rporation Japan 8 -6 15 Fluor US 17 2 16 Strabag S E Austria 22 6 17 Taisei Cor poration Japan 10 -7 18