Skill Set
|
Education
|
Junior
|
Middle
|
Senior
|
||||||
Exp (Yrs)
|
Min. Salary
|
Max. Salary
|
Exp (Yrs)
|
Min. Salary
|
Max. Salary
|
Exp (Yrs)
|
Min. Salary
|
Max. Salary
|
||
IT INFRASTRUCTURE
|
||||||||||
Data Center Engineer
|
BE / B.Tech / Any Graduation
|
4-8
|
3.00
|
10.00
|
8-15
|
12.00
|
23.00
|
-
|
-
|
-
|
Network Engineer
|
BE / B.Tech / Any Graduation
|
4-8
|
2.50
|
8.00
|
8-15
|
9.00
|
18.00
|
-
|
-
|
-
|
Oracle DBA
|
BE / B.Tech / Any Graduation
|
4-8
|
5.00
|
13.00
|
8-15
|
9.00
|
20.00
|
-
|
-
|
-
|
MS SQL DBA
|
BE / B.Tech / Any Graduation
|
4-8
|
4.00
|
14.00
|
8-15
|
11.00
|
19.00
|
-
|
-
|
-
|
Cloud Architect
|
BE / B.Tech / Any Graduation
|
4-8
|
6.00
|
16.00
|
8-15
|
17.00
|
26.00
|
-
|
-
|
-
|
Security Engineer
|
BE / B.Tech / Any Graduation
|
4-8
|
4.00
|
14.00
|
8-15
|
11.00
|
20.00
|
-
|
-
|
-
|
SOC /NOC Engineer
|
BE / B.Tech / Any Graduation
|
4-8
|
3.00
|
9.00
|
8-15
|
12.00
|
19.00
|
-
|
-
|
-
|
IT Manager
|
BE / B.Tech / Any Graduation
|
4-8
|
4.00
|
10.00
|
8-15
|
8.00
|
18.00
|
-
|
-
|
-
|
Windows /Unix Administrator
|
BE / B.Tech / Any Graduation
|
4-8
|
3.00
|
18.00
|
8-15
|
10.00
|
16.00
|
-
|
-
|
-
|
Bigdata(Hadoop) Admin
|
BE / B.Tech / Any Graduation
|
4-8
|
8.00
|
17.00
|
-
|
-
|
-
|
-
|
||
BMC Remedy
|
BE / B.Tech / Any Graduation
|
4-8
|
8.00
|
14.00
|
-
|
-
|
-
|
-
|
Typical Construction Sequence for Mechanical / Electrical / Plumbing Works in High Rise Building Grouping of MEP Fixes like PVC Electrical conduits in Slabs : 1. MEP 1st Fix - All Concealed Items/Pipe Sleeves in Verticals/Horizontals (Column/Slab) 2. MEP 2nd Fix - Stage 1: High Level MEP Works at False Ceiling i) Fixing supports, installation of Firefighting, Chilled Water piping, drainage pipes, water supply(hot & cold), rain water, cable ladders, G.I Conduiting, AC ducting ii) Pressure tests and insulations iii) Installation of FCUs, water heaters (Note: False Ceiling people will fix runners after the Stage 1 of MEP 2nd Fix) 3. MEP 2nd Fix - Stage 2: Clearance for False Ceiling People i) Sprinkler droppers, AC duct droppers, flexible cable for light fixtures, fire stopping and identification works etc. (Note: False Ceiling people will close ceiling tiles and MEP people will connect their diffusers in position on the ceiling tiles - too much coordination is required at ...
Comments