Skill Set
|
Education
|
Junior
|
Middle
|
Senior
|
||||||
Exp (Yrs)
|
Min. Salary
|
Max. Salary
|
Exp (Yrs)
|
Min. Salary
|
Max. Salary
|
Exp (Yrs)
|
Min. Salary
|
Max. Salary
|
||
POWER
|
|
|
|
|
|
|
|
|
|
|
Design Engineer
|
BE / Tech / Mechanical
|
4-6
|
7.00
|
14.00
|
8-14
|
15.00
|
30.00
|
15-20
|
35.00
|
55.00
|
Instrumentation Control
|
BE / Tech / Instrumentation
|
4-6
|
5.00
|
12.00
|
8-12
|
14.00
|
22.00
|
18-25
|
20.00
|
40.00
|
Health Safety and Environment
|
BE / Tech / Mechanical
|
3-6
|
5.00
|
14.00
|
7-12
|
12.00
|
28.00
|
18-25
|
50.00
|
70.00
|
Balance of Plant
|
BE / Tech / Electrical / Mechanical
|
4-6
|
8.00
|
16.00
|
8-10
|
12.00
|
37.00
|
15-20
|
25.00
|
70.00
|
Civil
|
BE / Tech / Civil
|
3-5
|
5.00
|
12.00
|
7-12
|
10.00
|
28.00
|
15-20
|
25.00
|
35.00
|
Transmission Engineer
|
BE / Tech / Electrical
|
4-6
|
6.50
|
12.00
|
8-12
|
10.00
|
35.00
|
18-25
|
40.00
|
75.00
|
Product Development
|
BE / Tech / Electronics
|
4-6
|
8.00
|
14.00
|
10-15
|
10.00
|
35.00
|
12-18
|
20.00
|
35.00
|
System Engineering
|
BE / Tech / Mechanical
|
4-9
|
5.00
|
13.00
|
10-15
|
12.00
|
25.00
|
12-18
|
18.00
|
35.00
|
Plant Operations
|
BE / Tech / Mechanical
|
4-6
|
6.00
|
12.00
|
8-14
|
11.00
|
23.00
|
12-18
|
20.00
|
40.00
|
Procurement
|
BE / Tech / Electrical
|
3-5
|
5.00
|
14.00
|
10-15
|
10.00
|
26.00
|
18-25
|
25.00
|
40.00
|
Installation
|
BE / Tech / Electrical
|
3-6
|
5.00
|
11.00
|
10-15
|
15.00
|
22.00
|
15-20
|
25.00
|
35.00
|
Project
|
BE / Tech / Mechanical
|
2-5
|
4.00
|
10.00
|
8-14
|
11.00
|
22.00
|
18-25
|
25.00
|
50.00
|
Supply Chain / Logistics
|
BE / Tech / Electrical / Mechanical
|
2-5
|
4.00
|
9.00
|
10-15
|
10.00
|
24.00
|
15-20
|
18.00
|
45.00
|
Quality
|
BE / Tech / Electrical / Mechanical
|
2-6
|
4.00
|
9.00
|
10-15
|
12.00
|
28.00
|
18-25
|
18.00
|
60.00
|
STG
|
BE / Tech / Mechanical
|
4-7
|
3.00
|
10.00
|
10-15
|
13.00
|
22.00
|
-
|
-
|
-
|
Systems Designer
|
Be / Tech / Diploma
|
3-5
|
3.00
|
8.00
|
-
|
-
|
-
|
-
|
-
|
-
|
Plant Inspection
|
Dipolma
|
2-5
|
2.00
|
6.00
|
10-15
|
10.00
|
19.00
|
15-20
|
20.00
|
35.00
|
Typical Construction Sequence for Mechanical / Electrical / Plumbing Works in High Rise Building Grouping of MEP Fixes like PVC Electrical conduits in Slabs : 1. MEP 1st Fix - All Concealed Items/Pipe Sleeves in Verticals/Horizontals (Column/Slab) 2. MEP 2nd Fix - Stage 1: High Level MEP Works at False Ceiling i) Fixing supports, installation of Firefighting, Chilled Water piping, drainage pipes, water supply(hot & cold), rain water, cable ladders, G.I Conduiting, AC ducting ii) Pressure tests and insulations iii) Installation of FCUs, water heaters (Note: False Ceiling people will fix runners after the Stage 1 of MEP 2nd Fix) 3. MEP 2nd Fix - Stage 2: Clearance for False Ceiling People i) Sprinkler droppers, AC duct droppers, flexible cable for light fixtures, fire stopping and identification works etc. (Note: False Ceiling people will close ceiling tiles and MEP people will connect their diffusers in position on the ceiling tiles - too much coordination is required at ...
Comments