Skip to main content

Hyderabad Metro Rail



Features of Hyderabad Metro Rail :- 
Hyderabad Metro Rail (MRTS) project is planned in three high density traffic corridors of the city spanning across 72 km in phase-I. 
  • • The three corridors spanning a length of approximately 72 km to be taken up in phase-I are as under.
    •  Corridor I: Miyapur – LB Nagar : 29 kms; 27 stations.
    •  Corridor II: JBS – Falaknuma : 15 kms; 16 stations.
    •  Corridor III: Nagole – Shilparamam : 28 kms; 23 stations.
  • • The Metro rail system under construction is a completely elevated system, generally run in the central median of the road. 
  • • The track gauge is a Standard Gauge (1435 mm).
  •  •Stations are located at an average interval of 1KM – elevated stations with passenger access through staircases, escalators and lifts;
  • With a frequency of 3 to 5 minutes during peak hours, the system is expected to carry about 17 lakh passengers per day by 2017 and 22 lakh by 2024; 
  • • With a maximum speed of 80 kmph, the average speed of the trains will be 34 kmph – an international standard for MRT systems;
  • • The travel time by metro rail from one end to another is:
    • 45 minutes for Corridor I (Miyapur-L.B.Nagar – 29Km) as against 1 hr 50 minutes by bus;
    •  22 minutes for Corridor II (Jubilee Bus Station-Falaknuma-15 Kms) as against 1 hr.10 minutes by bus;
    •  and 39 minutes for Corridor III (Nagole-Shilparmam-28 Kms) as against 1 hr. 30 minutes by bus;
  • • Coaches will be air-conditioned with automatic door-closures and many other safety features;
  • • All stations will have air conditioned “Merry go round” mini-bus services, connecting nearby colonies, business establishments and other popular places; 
  •  Smart card-based Automatic ticketing & gate systems for passenger convenience and seamless travel;
  • A train will consist of 3/6 coaches A.C. Coaches

  • • Each coach shall have 8 electrically powered exterior sliding bi-parting doors, 4 on each side and the doors open only at Metro Rail Stations.
  • • Width of each coach is scaled to 3.2m and the height of coach is 4.0m.
  • • The width of the elevated guide way structure is 9.6m with a lineup and down-line rail track signaling.



Comments

Popular posts from this blog

Construction Sequence of MEP works in Buildings

Typical Construction Sequence for Mechanical / Electrical / Plumbing Works in High Rise Building Grouping of MEP Fixes like PVC Electrical conduits in Slabs : 1. MEP 1st Fix - All Concealed Items/Pipe Sleeves in Verticals/Horizontals (Column/Slab) 2. MEP 2nd Fix - Stage 1: High Level MEP Works at False Ceiling i) Fixing supports, installation of Firefighting, Chilled Water piping, drainage pipes, water supply(hot & cold), rain water, cable ladders, G.I Conduiting, AC ducting ii) Pressure tests and insulations iii) Installation of FCUs, water heaters (Note: False Ceiling people will fix runners after the Stage 1 of MEP 2nd Fix) 3. MEP 2nd Fix - Stage 2: Clearance for False Ceiling People i) Sprinkler droppers, AC duct droppers, flexible cable for light fixtures, fire stopping and identification works etc. (Note: False Ceiling people will close ceiling tiles and MEP people will connect their diffusers in position on the ceiling tiles - too much coordination is required at ...

Mivan Shuttering Details

Details of Aluminum Formwork (Mivan / MFE) The most effective means available for the construction of high, medium and low rise mass housing R/C structures. It is a precision-engineered formwork fabricated in Aluminium. Monolithic pouring. Walls, columns, slabs & beam are poured together. Speed - Induces a disciplined & systemized approach to construction, which creates a daily work cycle, the essence of the productivity. The productivity generates a overall work cycle, that can achieve 4/5 day per floor outputs or other cycle times to suit your project requirements. It is flexible in design and can form any architectural or structural configuration, such as stairs, bay windows, curved features, etc. Quality - When struck the aluminium formwork reveals a good quality fair face onto which a 4–5mm skim coat can be applied for a perfect finish eliminating need of plaster. Provides an Integrated Scaffolding reducing the cost of your scaffoldi...

List of Top 200 Construction Companies in the world

The world's 200 largest construction companies Position Company Country 2007 Posit ion Change 1 Vinci France 1 - 2 Bouygues' Construction Divisions France 2 - 3 ACS Spain 5 2 4 Bechtel US 3 -1 5 China Rail way Group China 6 1 6 China Rail way Construction Corporation China 23 17 7 Hochtief Germany 4 -3 8 Ferrovial Spain 11 3 9 China Co mmunications Construction Group China 14 5 10 Skanska Sweden 9 -1 11 FCC Spain 25 14 12 China Stat e Construction & Engineering (CSCEC) China 13 1 13 Eiffage France 21 8 14 Kajima Co rporation Japan 8 -6 15 Fluor US 17 2 16 Strabag S E Austria 22 6 17 Taisei Cor poration Japan 10 -7 18...