LOW-COST GREEN BUILDING CONCEPTS

LOW-COST GREEN BUILDING CONCEPTS


1. Design for maximum natural day lightingUsing natural light from the sun is the best way to reduce energy consumption and lower the carbon footprint of a building. It costs nothing and is also beneficial for the health of the occupants — research shows that people perform better in naturally lit environments. Day lighting helps to lower lighting costs, reduces the price of cooling and can be accomplished without any increase in the cost of construction.

Buildings can be designed to receive adequate daylight and reduce the requirement of artificial lighting through innovative use of facades, windows and open areas.
2.Use a natural ventilation systemCooling costs make up for most of the energy consumption in any building. It is possible to cut down on cooling requirements by using a natural ventilation system. Windows can be used effectively to enable proper ventilation by taking advantage of the wind movement and thermal convection. Natural ventilation reduces the need for air conditioning and brings down power consumption. It also improves the indoor air quality as fresh air circulates in the building.
Windows must also be provided with overhangs to create a natural cooling system and reduce heat gain by screening out the sunlight.
3. Install water-efficient fixtures and toiletsDevelopers have little or no control over the consumption of water in their buildings once they are occupied by the owners. A smart way to ensure that the water consumption of the occupants remains low is to install water-efficient fixtures and toilets. Unlike old toilets that required 18-20 litres of water in every flush, new toilets use only about 6 litres per flush.
Flow reducers can be fitted into the aerator at the tip of the faucet to lower the rate of water flow. Using low-flow showerheads instead of standard showerheads also leads to substantial water savings. Low-flow toilets can save more than 80,000 litres of water per year for a family of four. One can reduce the consumption of water by nearly 40 per cent simply by using flow reducers.
4. Use zero- or no-VOC paintNo-VOC paints do not emit any volatile organic compounds and hence are environment friendly. Recent studies show that indoor air is usually between three and five times more toxic compared to outdoor air. Toxic emissions from paint and finishes are the biggest contributors to this. Using zero- or low-VOC paints can thus improve the indoor air quality. Low-VOC paints also help to reduce toxins that cause allergy, while zero or no-VOC paints are ideal for places like hospitals, offices and schools, which need to maintain good indoor air quality.
5. Use fly-ash in concreteFly ash, a by-product of coal-based power plants, is an excellent and inexpensive substitute for cement. Depending on the application, one can use 30- to 50-per cent fly ash mixed with concrete for construction. Using fly ash offers twin benefits: it reduces the amount of concrete needed for construction, and also increases the strength and durability of the concrete. In India, more than 60 per cent of power is generated through coal-based power plants. Using fly ash can reduce the environmental impact of cement production to a great extent. The government also encourages the use of fly ash in construction projects.

Comments

Popular posts from this blog

Construction Sequence of MEP works in Buildings

Typical Construction Sequence for Mechanical / Electrical / Plumbing Works in High Rise Building Grouping of MEP Fixes like PVC Electrical conduits in Slabs : 1. MEP 1st Fix - All Concealed Items/Pipe Sleeves in Verticals/Horizontals (Column/Slab) 2. MEP 2nd Fix - Stage 1: High Level MEP Works at False Ceiling i) Fixing supports, installation of Firefighting, Chilled Water piping, drainage pipes, water supply(hot & cold), rain water, cable ladders, G.I Conduiting, AC ducting ii) Pressure tests and insulations iii) Installation of FCUs, water heaters (Note: False Ceiling people will fix runners after the Stage 1 of MEP 2nd Fix) 3. MEP 2nd Fix - Stage 2: Clearance for False Ceiling People i) Sprinkler droppers, AC duct droppers, flexible cable for light fixtures, fire stopping and identification works etc. (Note: False Ceiling people will close ceiling tiles and MEP people will connect their diffusers in position on the ceiling tiles - too much coordination is required at

List of Top 200 Construction Companies in the world

The world's 200 largest construction companies Position Company Country 2007 Posit ion Change 1 Vinci France 1 - 2 Bouygues' Construction Divisions France 2 - 3 ACS Spain 5 2 4 Bechtel US 3 -1 5 China Rail way Group China 6 1 6 China Rail way Construction Corporation China 23 17 7 Hochtief Germany 4 -3 8 Ferrovial Spain 11 3 9 China Co mmunications Construction Group China 14 5 10 Skanska Sweden 9 -1 11 FCC Spain 25 14 12 China Stat e Construction & Engineering (CSCEC) China 13 1 13 Eiffage France 21 8 14 Kajima Co rporation Japan 8 -6 15 Fluor US 17 2 16 Strabag S E Austria 22 6 17 Taisei Cor poration Japan 10 -7 18

Tallest Building under construction