Skip to main content

Insulation System & application methodology for Slabs



( Polyisocyanurate panels for Ceiling Insulation):- CFC-free Polyisocyanurate rigid foam sheet laminated with vliepatex-N ( Vliepa, Germany) from one side and Aluminium foil from the other side, The density of the panel is 40-45 Kg/m3.. Vliepatex is specially used as lamination for the PIR, PU panels, suitable for coating materials like epoxy coating ,acrylic coating, etc. 
Technical Data:-
         1. ( Polyisocyanurate panels for Ceiling Insulation):-
Density
ASTM C 303: 2002
40-45 kg/m³
Water absorption by volume
ASTM C 209: 1998
0.03%
Thermal conductivity group
ASTM C518: 2002
K=0.023 W/mk
Characteristics in fire
DIN 4102-1
B2
Temperature stability
Upto 250 Deg C in short term ,constant from -50 Deg C until + 110 Deg C
Pressure load
0.1 N/mm² oder 10 t/m²
 2. Vliepatex-N:-

Material:
EN 29073-1
Glass fibre: SH 50    approx.48-60 g/m²
Material coating        approx. 230 g/m²
Mass per unit area:
EN 29073-1
Approx. 290 g/ m² ± 10%
Thickness:
ISO EN 9073-2
< 0.6 mm
Rest moisture content:
ISO 287
< 0.8%
Class of fire
DIN 4102-1
B2
Tensile strength
Machine direction:
Cross machine direction
EN 29073-3

2.0%
2.0%
Water vapour permeability
DIN 53122-1
Ca.123 g/ m² x d
Application: Used as lamination material  for the PIR , PU panels, suitable for coating materials like epoxy coating ,acrylic coating etc.

METHOD OF APPLICATION


    Fig 1
1) Drill a hole of depth 7.5 cm using a 10 mm drill bit along with the insulation panel. (Ref Fig-1)
    2) Fix the plug in the hole
    3) Insert the nylon nail using a mallet.
    4) Hammer the nylon nail along with plug.
    5) Hammering the plug head 2 mm inside the panel. 

                                             Fig 2

Fixing the self adhesive mesh on the head of the plugs and all over the joints (Ref Fig-2)
1) Applying the filler all over the plug heads and joints
        (Ref Fig-3)
    2) Applying primer all over the surface. 
    3) Applying the final coating. 
Note:-
1) Surfaces should be checked to ensure the leveling before fixing the panels.
2) All the joints between the panels should be closed tightly.

Comments

Unknown said…
It is very important to kow the whole mechanism of drilling holes in solid surfaces as it make you very efficient and effective drills to these products.

Thanks
Bruce Hammerson

Hammer Bits

Popular posts from this blog

Construction Sequence of MEP works in Buildings

Typical Construction Sequence for Mechanical / Electrical / Plumbing Works in High Rise Building Grouping of MEP Fixes like PVC Electrical conduits in Slabs : 1. MEP 1st Fix - All Concealed Items/Pipe Sleeves in Verticals/Horizontals (Column/Slab) 2. MEP 2nd Fix - Stage 1: High Level MEP Works at False Ceiling i) Fixing supports, installation of Firefighting, Chilled Water piping, drainage pipes, water supply(hot & cold), rain water, cable ladders, G.I Conduiting, AC ducting ii) Pressure tests and insulations iii) Installation of FCUs, water heaters (Note: False Ceiling people will fix runners after the Stage 1 of MEP 2nd Fix) 3. MEP 2nd Fix - Stage 2: Clearance for False Ceiling People i) Sprinkler droppers, AC duct droppers, flexible cable for light fixtures, fire stopping and identification works etc. (Note: False Ceiling people will close ceiling tiles and MEP people will connect their diffusers in position on the ceiling tiles - too much coordination is required at

List of Top 200 Construction Companies in the world

The world's 200 largest construction companies Position Company Country 2007 Posit ion Change 1 Vinci France 1 - 2 Bouygues' Construction Divisions France 2 - 3 ACS Spain 5 2 4 Bechtel US 3 -1 5 China Rail way Group China 6 1 6 China Rail way Construction Corporation China 23 17 7 Hochtief Germany 4 -3 8 Ferrovial Spain 11 3 9 China Co mmunications Construction Group China 14 5 10 Skanska Sweden 9 -1 11 FCC Spain 25 14 12 China Stat e Construction & Engineering (CSCEC) China 13 1 13 Eiffage France 21 8 14 Kajima Co rporation Japan 8 -6 15 Fluor US 17 2 16 Strabag S E Austria 22 6 17 Taisei Cor poration Japan 10 -7 18

Tallest Building under construction