Skip to main content

concept Houses - House on Cliff



On the first day on the project, we decided to fly it off a cliff,” says Brian MacKay-Lyons, describing the simple wood and steel–frame residence his firm designed. The two-story, 970-square-foot house juts out from its perch on a bluff overlooking Nova Scotia's windswept Atlantic coast. “We thought, 'we can be boring and build on land, or we can do it this way.' ” And so the Cliff House was born





The owners, a young family that shuttles between a primary residence in California and their native Nova Scotia, didn't want their summer house to upstage its dramatic site. To that end, Halifax-based MacKay-Lyons Sweetapple Architects (MLS) hewed to their practice's principles, choosing simple materials: an envelope of cedar acts as a kind of “wood lampshade,” wrapping a steel frame, explains MacKay-Lyons. The area's ubiquitous fishing shacks served as inspiration for the Cliff House, and the architect expects the house's cladding, like that of the cabins from which it takes its form, to “pickle” in Nova Scotia's briny air.




Inside, the house has a pared-down, rough-hewn aesthetic that showcases its wood-and-steel construction. This simplicity, says MacKay-Lyons, minimizes distractions, highlighting views of the ocean and coastline just beyond large windows at the front of the house. Open-plan communal spaces on the first level, and a second-level bedroom that overlooks the living room and has views out to the sea, create a sense that the house is “hung from the ocean horizon,” says MacKay-Lyons. “When you're in the house, you should feel mostly a sense of refuge.


Comments

Popular posts from this blog

Construction Sequence of MEP works in Buildings

Typical Construction Sequence for Mechanical / Electrical / Plumbing Works in High Rise Building Grouping of MEP Fixes like PVC Electrical conduits in Slabs : 1. MEP 1st Fix - All Concealed Items/Pipe Sleeves in Verticals/Horizontals (Column/Slab) 2. MEP 2nd Fix - Stage 1: High Level MEP Works at False Ceiling i) Fixing supports, installation of Firefighting, Chilled Water piping, drainage pipes, water supply(hot & cold), rain water, cable ladders, G.I Conduiting, AC ducting ii) Pressure tests and insulations iii) Installation of FCUs, water heaters (Note: False Ceiling people will fix runners after the Stage 1 of MEP 2nd Fix) 3. MEP 2nd Fix - Stage 2: Clearance for False Ceiling People i) Sprinkler droppers, AC duct droppers, flexible cable for light fixtures, fire stopping and identification works etc. (Note: False Ceiling people will close ceiling tiles and MEP people will connect their diffusers in position on the ceiling tiles - too much coordination is required at

List of Top 200 Construction Companies in the world

The world's 200 largest construction companies Position Company Country 2007 Posit ion Change 1 Vinci France 1 - 2 Bouygues' Construction Divisions France 2 - 3 ACS Spain 5 2 4 Bechtel US 3 -1 5 China Rail way Group China 6 1 6 China Rail way Construction Corporation China 23 17 7 Hochtief Germany 4 -3 8 Ferrovial Spain 11 3 9 China Co mmunications Construction Group China 14 5 10 Skanska Sweden 9 -1 11 FCC Spain 25 14 12 China Stat e Construction & Engineering (CSCEC) China 13 1 13 Eiffage France 21 8 14 Kajima Co rporation Japan 8 -6 15 Fluor US 17 2 16 Strabag S E Austria 22 6 17 Taisei Cor poration Japan 10 -7 18

Tallest Building under construction