Skip to main content

Concept Houses - Hill Side



Program: The client, a businessman with a young family, wanted to experiment with unusual construction methods for his new house on a steep hill overlooking the sea and mountains outside Barcelona. He had three requests—large windows to take advantage of views, privacy from the neighbors, and the use of a new concrete technology that, if successful, could be marketed and used in future projects

Solution: The architects designed an X-shaped, two-story house on a relatively flat step in the hillside and sprayed high-density concrete at high pressure to single-sided formwork, a technique usually used for tunnels and bridges, not residential work. Glazed portions of the structure were angled to allow privacy from the neighbors and to take advantage of views of the landscape.

The family parks its cars and enters the house at the upper level—with a master suite and studio—and descends to the lower level for a double-height living area, three bedrooms, and a combined kitchen and dining area with a 20-foot-long marble table designed by the architects. A rooftop terrace and balcony overlook a polygonal pool, farther down the hillside, which fits between the arms of the X-shaped plan like a piece of a puzzle.

Following Pics give a elaborate view








Comments

Popular posts from this blog

Construction Sequence of MEP works in Buildings

Typical Construction Sequence for Mechanical / Electrical / Plumbing Works in High Rise Building Grouping of MEP Fixes like PVC Electrical conduits in Slabs : 1. MEP 1st Fix - All Concealed Items/Pipe Sleeves in Verticals/Horizontals (Column/Slab) 2. MEP 2nd Fix - Stage 1: High Level MEP Works at False Ceiling i) Fixing supports, installation of Firefighting, Chilled Water piping, drainage pipes, water supply(hot & cold), rain water, cable ladders, G.I Conduiting, AC ducting ii) Pressure tests and insulations iii) Installation of FCUs, water heaters (Note: False Ceiling people will fix runners after the Stage 1 of MEP 2nd Fix) 3. MEP 2nd Fix - Stage 2: Clearance for False Ceiling People i) Sprinkler droppers, AC duct droppers, flexible cable for light fixtures, fire stopping and identification works etc. (Note: False Ceiling people will close ceiling tiles and MEP people will connect their diffusers in position on the ceiling tiles - too much coordination is required at

List of Top 200 Construction Companies in the world

The world's 200 largest construction companies Position Company Country 2007 Posit ion Change 1 Vinci France 1 - 2 Bouygues' Construction Divisions France 2 - 3 ACS Spain 5 2 4 Bechtel US 3 -1 5 China Rail way Group China 6 1 6 China Rail way Construction Corporation China 23 17 7 Hochtief Germany 4 -3 8 Ferrovial Spain 11 3 9 China Co mmunications Construction Group China 14 5 10 Skanska Sweden 9 -1 11 FCC Spain 25 14 12 China Stat e Construction & Engineering (CSCEC) China 13 1 13 Eiffage France 21 8 14 Kajima Co rporation Japan 8 -6 15 Fluor US 17 2 16 Strabag S E Austria 22 6 17 Taisei Cor poration Japan 10 -7 18

Tallest Building under construction